Homepage | Set Home | Add to Favorites
Member

Xianning City Topway Metal Products Co., Ltd


Products
  • No Category
Search
 

Friends links

Frame Scaffolding Steel Plank Catwalk
Click image to view full size image
Product: Views:184Frame Scaffolding Steel Plank Catwalk 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2020-08-05 14:35
  Inquiry
Details

1. Product overview

Steel plank catwalk is a new type of construction tool, widely used in the construction industry, shipbuilding industry, anti-corrosion construction, oil platform installation, a variety of enterprise construction project scaffolding supporting the use of a tool.

Steel plank catwalk is a new type of construction product, which has the advantages of fire prevention, light weight, corrosion resistance, alkali resistance, pressure resistance, high strength and good anti-skid effect.

The hole spacing of steel Steel plank catwalk is uniform and standardized, the appearance is beautiful and generous, and the service life can be as long as 6-8 years.


2. Specification

Material: Q235,Q195

Color: Sliver

Warranty: 2 years


Size(width×height)

Thickness

Length

Surface treatment

210×45mm

0.8-2.5mm

500-4000mm

Pre-galvanized

225×38mm

0.8-2.5mm

500-4000mm

Pre-galvanized

240×45mm

0.8-2.5mm

500-4000mm

Pre-galvanized

250×40/50mm

0.8-2.5mm

500-4000mm

Pre-galvanized

300×63.5/65mm

0.8-2.5mm

500-4000mm

Pre-galvanized



3. Product display



4. Packaging



5. FAQ

Q.1 Are you a trader or manufacturer?

We are a production and marketing,industry and trade integration company.


Q.2 Where is your company located?

Head office is located xianning city,Hubei province,china,our factory is located Tianjin,china.


Q.3 Can you accept "ODM"?

Of course,we can accept "ODM".If you have problems in designing,we will offer you the best engineer.


Q.4 How long is the warranty?

2 years.


Q.5 How about the delivery time?

Under normal conditions 7-15 days,but it's according to your quantity.


http://www.topway-scaffold.com/

Inquiry